Turnkey Solutions for BESS – Designed and Built by RADIX
RADIX was the preferred screw pile contractor to complete the full design, supply & installation of screw pile foundations, including structural steelwork, for ESM Power at Orchardbank.
Client:
ESM Power
Location:
Orchardbank, Forfar
Project:
20MW (40MW hrs) Battery Storage
Sector:
Renewable Energy
Services:
- Pre-construction survey & testing
- Foundation Design
- Supply & Installation of RDX EXT Screw Piles + Support Steelwork
Products:
- 104 no. RDX PRO 114mm x 2900mm Screw Piles
- 20 no. RDX EXT 76mm x 2500mm Screw Piles
- Structural steel support steelwork

Overview
Providing a fast response RADIX provide a full turnkey screw pile foundation and completed installation in 7 days
With Made Ground containing a mix of natural and artificial materials a robust and effective solution was required to ensure suitability for landing Canadian Solar SolBank containerised energy storage units and SMA MVPS (Medium Voltage Power Station) units, removing the concern for differential settlement in less stable ground.
RADIX attended site further to project consultation and completed a series of static load testing to allow a screw pile foundation solution to be designed and implemented, providing absolute stability.

Solution
Responsive design and site mobilisation
Attend site and complete static load testing and reporting, allowing a complete design package to be submitted for approval withing 21 days of instruction.
Undertake the installation of screw pile foundations and structural support steelwork to allow ESM Power to land Canadian Solar batteries and SMA Inverters within 10 days of mobilising for site installation.